Short-run production without tooling cost, minimum-run commitments, or a six-week wait to find out the design changed.
There is an awkward band between "we need three" and "we need fifty thousand". Below it, everyone will help you. Above it, injection molding is obviously right. In the middle, tooling costs more than the parts and the lead time is measured in weeks you do not have. That band is where additive manufacturing quietly earns its living.
Quantity pricing is applied automatically in the estimator. As the run gets larger the per-part price steps down, and the tool shows you the break points as you change the number. Nothing to negotiate, nothing to ask for. Change the quantity from 5 to 25 and watch what happens; sometimes building more is cheaper in total than you expect.
Orders start at a $30 minimum, which exists so that a two-dollar part does not cost more to invoice than to make. Beyond that there is no minimum run, no per-order setup fee to absorb, and no pressure to round your quantity up to somebody else's batch size.
Production parts are made from the same file, the same material and the same profile every time, and for as long as a job is open we hold the exact CAD it was priced from, so a repeat order builds the revision you actually approved rather than whatever was in the folder six months later. Ask us to keep it on file for future runs and we will; otherwise it is deleted when the project closes. If a part is going to recur, tell us and we will note the setup so run two matches run one.
Lead time in the estimator is calculated from the real print time for your geometry and quantity, so a bigger run genuinely reports a longer estimate rather than a marketing number. If you need it faster, the expedite option shows you the fastest schedule we can commit to and what that costs. If you need it by a fixed date, say so in the notes and we will confirm during review.
Instant estimate. Final pricing and manufacturability are confirmed by an engineer before production.
Change the quantity in the estimator and watch the break points move. No account needed.
Get an Instant EstimateInstant estimate. Final pricing and manufacturability are confirmed by an engineer before production.
Upload the part, set the quantity, watch the volume pricing apply itself.